Sea Cliff Whole-Home Renovation & Restoration

Sea Cliff holds its Mediterranean-revival houses against the weather — clay-tile roofs, masonry walls, and the Golden Gate below the bluff. Renovation here is envelope work as much as interiors, and a whole-home remodel in Sea Cliff answers to salt air first. Design, permits, and construction run on one team — one schedule, one fixed proposal.

We Do Construction renovates Sea Cliff’s Mediterranean-revival and period masonry homes — whole-house systems replacement, clay-tile roofs, envelope restoration against salt air, and cliffside structural work. One team carries each project from feasibility through SF Planning and DBI to final inspection, under a single contract.

Who We Build For in Sea Cliff

Homeowners Planning to Stay Long-Term

This is the house you’re keeping. You want it re-wired, re-plumbed, structurally sound, and reorganized to live the way you actually do — done once, comprehensively.

Growing Families

The house has to grow with the family — more bedrooms, a real kitchen, a better connection to light and the yard. We sequence the work and, where possible, keep part of the house livable.

Owners of Bluff & Period Estates

You own a Sea Cliff estate and want it brought current — systems, seismic, envelope — built to stand up to salt air and protect the views, without losing the period architecture.

What should Sea Cliff homeowners know before renovating?

Sea Cliff's Mediterranean-revival and period masonry homes went up from the 1910s through the 1930s, on bluffs directly above the Golden Gate — a setting that dictates the work. Coastal geotechnical review comes first on anything structural near the bluff edge; salt air ages building envelopes faster than almost anywhere else in the city, so stucco, flashing, windows, and clay-tile roofs are recurring scopes rather than one-time fixes. And because nearly every lot trades on its view, Section 311 neighbor notification is a live factor on expansions — neighbors read those drawings carefully. A design-build contractor in Sea Cliff plans for all three: the soil, the weather, and the notice period, priced into one schedule from the start.

We Do Construction (CSLB #1096552) treats the envelope as the project's foundation, not its finish. If your house is due for more than paint, we are glad to look at it with you.

Last updated July 2026.

SIGNATURE MOMENTS

What separates a full remodel from a series of renovations.

Whole-home coordination

Plumbing, electrical, and HVAC designed together — not retrofitted room by room. Systems that work as a single home.

Live-in sequencing

We phase construction around your occupancy when possible. You don't always have to leave for a full remodel.

Single-team delivery

One GC. One point of contact. No finger-pointing between trades when something needs resolution.

ENGAGEMENT MODEL

Three phases. Every room. No handoffs.

Flat-fee at every phase. You know the total investment before work begins.

PHASE 01

Discovery

We assess your entire home — structure, systems, layout — and align the scope to how your household actually lives.

PHASE 02

Design

Integrated design across every room. Finishes, fixtures, and spatial flow resolved together so nothing conflicts.

PHASE 03

Construction

Phased execution across all spaces, coordinated by one team. You stay informed at every milestone.

Architecture & Floor Plan

Opening a formal plan to the view, or reworking circulation on a bluff lot, is where the value is — and where SF Planning pays the most attention.

Structure & Foundation

Sea Cliff homes hide soft foundations, undersized framing, and seismic and slope realities on bluff lots. We engineer the fixes — new footings, shear, steel, drainage — into the scope, not the surprises.

Systems: Electrical, Plumbing & HVAC

Knob-and-tube out, modern service in; re-plumbed supply and drains; heating and ventilation sized for the whole house — done while the walls are open.

Finishes & Millwork

Rift-sawn white oak, honed stone, custom millwork — specified and detailed before demolition so the trades build to a drawing, period-correct for the house.

The Old Way

Our Design-Build Approach

Why Renovate in Sea Cliff

Increase Property Value

In Sea Cliff, a permitted, structurally documented renovation is the value move — the value is in the structure, systems, seismic, and approvals, not a surface refresh.

Improve Daily Functionality

A plan that finally fits the family, light brought in from the rear, and a house that works as one — the difference between patching and actually solving the house.

Modernize the Look and Feel

Consistent materials and detailing across every room — a house that reads as one considered project rather than a decade of piecemeal fixes.

PROCESS AT A GLANCE

One team. One timeline.

Every trade coordinated under one contract. No gaps, no handoffs.

STAGE 01

Discovery

2–4 weeks

Whole-home assessment, structural evaluation, scope alignment.

STAGE 02

Design

6–12 weeks

Integrated room-by-room design, material selections, system planning.

STAGE 03

Permit

3–8 weeks

Permit drawings, city submission, multi-trade approvals.

STAGE 04

Build

4–12 months

Phased construction across all rooms through final walk-through.

Read the full process →

What to Expect Building in Sea Cliff

A full renovation in Sea Cliff is a real permit — structural, electrical, plumbing, and SF Planning review for additions or façade changes. Plan on design, a Planning review window, and several months of construction. We file the set with SF and carry it through every inspection.

What Impacts the Cost of a Sea Cliff Renovation

Professionals Tips

Increase Property Value

A whole-house renovation done right is the biggest value move a home here can make — but the value is in the structure, the systems, and the permits, not a surface refresh.

Improve Daily Functionality

A plan that finally fits the family, light brought in from the rear, and a house that works as one — the difference between patching and actually solving the house.

Modernize the Look and Feel

Consistent materials and detailing across every room — a house that reads as one considered project rather than a decade of piecemeal fixes.

Increase Property Value

A whole-house renovation done right is the biggest value move a home here can make — but the value is in the structure, the systems, and the permits, not a surface refresh.

Improve Daily Functionality

A plan that finally fits the family, light brought in from the rear, and a house that works as one — the difference between patching and actually solving the house.

Modernize the Look and Feel

Consistent materials and detailing across every room — a house that reads as one considered project rather than a decade of piecemeal fixes.

What Our Clients Say

Over 150 five-star reviews

Over 85 five-star reviews

Over 20 five-star reviews

BBB Accredited Business

We Do Construction, Inc.

Featured Sea Cliff Projects

Recent San Francisco period-home restorations, whole-house renovations, and additions — Sea Cliff and the northern neighborhoods.

What sets us apart Three differentiators
01
of 03
Live-in sequencing available
We phase work so you can stay in the home during the remodel — rare in this market, standard for us.
Scheduling
02
of 03
One coordinated permit package
Structural, MEP, and finish permits pulled together — no relay-race handoffs between subs.
Permitting
03
of 03
Locked scope before demo starts
Every finish selection confirmed prior to teardown. No mid-project change orders that blow your budget.
Budgeting

FAQ

Yes — a full renovation means a structural permit set with SF DBI, plus SF Planning review if you are adding square footage or changing the façade. We file it, manage the review, and carry the job through every inspection.

Typically several months of design, a permitting window for structural and Planning review, and several months of construction — often a year or more for a down-to-studs project. We give you the real schedule in feasibility.

Rarely for a true down-to-studs renovation — it is safer and faster with the house empty. For phased or partial-scope work we can sometimes keep part of the house livable.

It depends on square footage, how much structure, seismic, and systems work is involved, and the finish level. We price it in feasibility against a real scope, then hold it in a fixed proposal.

Both. We are design-build — architecture, engineering, permitting through SF Planning and DBI, and construction on one team and one contract.

Yes — older SF homes need foundation, shear, and seismic upgrades. We engineer those into the scope so the renovation is sound, not just refinished.

Yes — Sea Cliff and the wider city. Each project files with SF Planning and DBI.

Yes. After feasibility and a defined scope we issue one fixed proposal covering design, permits, and construction.

How much does a full home remodel cost in San Francisco?

A full home remodel in San Francisco typically runs $350,000–$900,000+ in 2026 — roughly $300–$600 per square foot, and higher when structural or seismic work is involved. The range reflects SF labor rates, the realities of pre-1978 housing stock, and the finish level of a design-build home. We Do Construction (CSLB #1096552) delivers whole-home remodels across San Francisco on a single fixed-price design-build contract.

TierTypical SF range (2026)Scope
Finishes-forward$350,000–$500,000Existing layout kept, new kitchen and baths, finishes, systems refresh
Full reconfiguration$500,000–$750,000New floor plan, relocated plumbing and electrical, Title 24 systems
Structural / addition-grade$750,000–$900,000+Walls out, steel and seismic upgrades, custom millwork throughout

SF labor/trade rates per Block Renovation SF data. Ranges are planning figures — your fixed number comes out of feasibility. Last updated June 2026.

What permits does a full home remodel require in San Francisco?

A whole-home remodel touching layout, structure, plumbing, electrical, or mechanical systems requires a building permit from the SF Department of Building Inspection (DBI), and work that changes the building envelope or use also goes through SF Planning. Full-scope and structural permits run 2–4+ months in plan review, and additions 3–6 months; historic districts north of California Street add design review. Pre-1978 homes also trigger lead and asbestos protocols. As a licensed SF general contractor (CSLB #1096552), We Do Construction files and manages the entire DBI and Planning process in-house. Last updated June 2026.

Ready to start your project?

Fill out the form and our team will get back to you to discuss your project goals.

Apply for Discovery