
The Daly City Garden ADU
ADU and Garage Conversion Specialists in Daly City
WDC builds accessory dwelling units in Daly City — garage conversions, detached studio units, and junior ADUs — managed through the City of Daly City Building Division permitting with full construction coordination. Daly City is one of the inner Valley’s best ADU markets: detached garages on generous lots, strong rental demand, and a homeowner community that increasingly values flexible on-property living arrangements.



ADU Rules in Daly City
- Detached ADUs — up to 1,200 sqft on most single-family lots; setbacks and lot coverage limits apply by zone
- Garage conversions (ADU) — detached and attached garages convertible to living space; replacement parking generally not required
- Junior ADUs (JADUs) — up to 500 sqft within the primary structure with separate entry
- the City of Daly City Building Division Daly City plan check — standard garage conversions typically run 4–8 weeks in plan check
- SB 543 (2026) — ADUs at or under 750 sqft exempt from school developer fees under current California law
ADU Types We Build in Daly City
- Garage Conversion — most common ADU type in Daly City; detached single-car and double-car garages convert efficiently to full studio or one-bedroom units
- Detached ADU / Studio — new construction in rear yard; ideal for rental income or independent living for family members
- JADU (Junior ADU) — interior conversion within primary home with separate entry, kitchenette, and private bath
Every WDC ADU includes complete scope: structural, electrical, plumbing, HVAC, insulation, windows, finishes, and full permit management through certificate of occupancy.
Daly City ADU — Frequently Asked Questions
How long does a garage conversion take in Daly City?
A full garage conversion in Daly City typically takes 6–10 months from contract to certificate of occupancy — including design, the City of Daly City Building Division plan check, and construction. The detached garage format common in Daly City is well-suited to efficient conversion timelines.
Can I build an ADU and renovate my primary home at the same time?
Yes — and this is often the most efficient approach. WDC coordinates ADU and primary home renovation under a single permit set and construction schedule when both projects are in scope. One mobilization, one disruption period.
Build Your Daly City ADU
Daly City garage conversions are some of the most efficient ADU projects in the inner Valley. A consultation with WDC confirms feasibility and maps the City of Daly City Building Division permit path before you commit to design.
Request a consultation(415) 416-5494